A contractor patches a wall and sends a photo. Usually that's enough. When it isn't, Teleport sends someone nearby to re-shoot the repair for $9, and the sign-off goes from “submitted evidence” to Verified. The manager pays the invoice on the proof.

A contractor's repair, re-shot and verifiedAn empty apartment from above, with a freshly patched stretch of wall. The contractor's one close-up photo comes in, drawn dashed and marked as submitted. It isn't enough, so a linked nine-dollar task posts. Someone nearby walks in from the door and photographs the patch from three spots: wide, left and right. Four checks tick, the assurance steps up from standard to verified, and a receipt prints: paid nine dollars, wall verified.DOORUNIT 3C · VACANTPATCHWIDELEFTRIGHTASSURANCESTANDARD→ VERIFIEDSUBMITTED1 PHOTONO EXIFRE-SHOOT · 3CLINKED TO A$9 · NEARBYCHECKSIN UNIT 3CIN WINDOW3 ANGLESAS SPECIFIEDVERIFIEDPAID $9.00WALL VERIFIED
Example · fictional unit · prices illustrative
§ 01

One wall, two kinds of evidence.

Managers pay for repairs they rarely see. The contractor's photos are a start. When they're thin, someone who wasn't paid to do the work takes a second look.

Who asks
The property manager. Each work order gets a Teleport link the contractor submits to.
Who does the work
The contractor, hired directly. Teleport doesn't schedule them, pay them or take a cut.
Who checks it
Someone nearby, onboarded, with no stake in the contractor. Only sent when the contractor's photos aren't enough.
Evidence
The contractor's upload first. Then, if needed, a live Teleport capture from the angles the task lists.
Who pays
The manager: $9 to the re-shooter on accept, plus the verification fee. The contractor's invoice is paid by the manager, on the proof. Example figures.
You get
Independent proof the job is visibly finished, upgraded from “submitted evidence” to Verified.
A freshly patched and painted wall in an empty room

Not a flat no. A second look, for nine dollars.

The short version

Most work orders clear on the contractor's photos alone. Teleport sends someone only when the evidence can't carry the claim, and the proof says which it was.

Live near rental buildings? Join the contributor waitlist

Unit 3C and Northgate Property are fictional. Prices are illustrative.

§ 02

Weak evidence becomes strong evidence.

Where the evidence came from decides what the proof can say. The contractor's upload stays on the record. The linked re-shoot is what lifts the claim to Verified.

TASK A · VERIFY ONLYFROM THE CONTRACTORCLOSE?WIDE?ANGLEORIGIN · SUBMITTEDVERIFIESTASK ATASK B · RE-SHOOT$9 · SOMEONE NEARBYWIDELEFTRIGHTORIGIN · TELEPORTSTANDARDSUBMITTED ONLYVERIFIEDTELEPORT CAPTUREHIGH ASSURANCE+ PERSON REVIEWTHIS CLAIMNOT NEEDED HERE

Each item keeps its own origin in the proof: submitted for the upload, Teleport capture for the re-shoot. High assurance, which adds a person's review, is there for bigger jobs. A $9 drywall patch doesn't need it.

§ 03

From repair to receipt, in six steps.

The contractor does the job. The manager pays for it. Teleport sits in between and finds out whether it's actually finished.

  1. 01

    Repair done

    The contractor patches and paints the wall in unit 3C. That part happens entirely outside Teleport.

  2. 02

    Photos in

    The contractor opens the work order's Teleport link and uploads completion photos.

  3. 03

    Too thin

    One close-up, no wide shot, the metadata stripped. Not a no: the evidence just can't carry the claim yet.

  4. 04

    Linked re-shoot

    A $9 task posts for someone nearby, linked to the first. Re-shoot the wall from three listed angles.

  5. 05

    Checked

    Place, window, angles and freshness by rule. One question goes to a model: is it finished as specified?

  6. 06

    Paid + proven

    The re-shooter is paid on accept. The manager pays the contractor's invoice on the proof.

§ 04

Five rules, one question, and what none of them prove.

Only one check asks a model: does this look finished, as the work order describes? A versioned policy, not the model, makes the decision.

CheckProvesDoesn't proveByResult
In unit 3CCaptured inside the building's geofence, with the unit's lockbox code entered at the start.—RulePassed
In the windowCaptured during the agreed entry window, by trusted device time, not the phone's clock.—RulePassed
Every angleWide, left and right, each with the repair inside the guided frame.—RulePassed
Live, not reusedCaptured in the Teleport app, and none of it matches the contractor's upload or any earlier capture.—RulePassed
Only the repairAnything outside the repair area, like belongings, faces or documents, is covered before delivery.—RulePassed
Finished as specifiedPatch flat, primed and painted to match, with no visible seam, as the work order describes.That it's to code, or anything behind the wall.ModelPassed

Re-shoot shows the job isn't finished? The manager and the contractor both see “not accepted”, with the photos and the reason. The re-shooter is still paid for an accurate capture.

§ 05 · Entry and scope

The wall, in the window. Nothing else.

Someone is entering a home or a unit for a third party. The owner, or the tenant if someone lives there, agrees first and picks the window. The re-shooter photographs the repair, not the rooms around it. And the proof says exactly what it is: visibly finished as specified, not done to code.

CAPTUREZONEDOORNO PHOTOSROOMSNO PHOTOSBELONGINGSTUE 10–12ONE VISIT4471CODE WORKSIN THE WINDOW
Entry consent · Unit 3CActive · v1
Granted by
The owner, while vacant. The tenant, once occupied.
Window
Tue 10:00–12:00, one visit
Access
Lockbox code, valid in the window only
Photos
The repaired wall. Nothing else in the unit.
Verified
Visibly finished as specified
Not verified
Code compliance, what's behind the wall

Its hash goes into the proof, and the proof page shows the scope word for word.

§ 06

What needs care.

A stranger, in someone's unit, checking someone else's work. Each of those needs its own line.

  • Thin isn't a no

    A contractor with a weak photo gets a second look, not a rejection. If the re-shoot shows the job isn't done, they see the photos before anyone holds back pay.

  • Say what was proven

    Visibly finished as specified. Not to code, and not what's behind the wall. That line goes in the proof, on the proof page and in the contract.

  • Someone's home

    An occupied unit needs the tenant's yes and a window they chose. Re-shooters are onboarded at a higher trust tier, and visits are time-boxed.

  • The wall, not the room

    The guided capture frames the repair. Anything else that slips into the frame is covered before the manager sees it.

  • No stake in the answer

    The re-shooter is paid the same whether the wall passes or not, and is never the contractor or their crew.

  • The invoice stays put

    Teleport never pays the contractor or holds their money. The manager's own system pays on a signed decision.

§ 07

A sign-off the manager can pay on.

One proof for the whole work order: the contractor's upload, the re-shoot that verified it, the scope of the answer and the policy that gave it.

Dollars pay the re-shooter. The contractor's invoice never touches Teleport. Nobody needs $PORT to post a work order or get paid for a re-shoot.

PROOF OF PHYSICAL WORKclaim · example
VERIFIED

Task
Drywall repair · unit 3C
Requested by
Property manager
Work by
Contractor · outside Teleport
Checked by
Human · onboarded, nearby
Evidence
Upload → Teleport capture
Assurance
Standard → Verified
Scope
Visibly finished · not code
Decision
Accepted
Paid
$9.00 to the re-shooter

STATUS: FINAL

The contractor's invoice: paid by the manager on this proof. Never held by Teleport.

Example receipt. Fictional unit; amounts illustrative.
§ 08

For builders.

A VERIFY_ONLY task the contractor submits to. When the evidence is thin, a linked MARKETPLACE capture with relations.verifiesTaskId. Where each item came from decides the assurance.

PhysicalTaskSpec · the linked re-shootTAP v0.2 · preview, subject to change
{
  "schema": "teleport.tap.physical-task",
  "version": "0.2.0",
  "title": "Re-photograph the drywall repair in unit 3C",
  "category": "CAPTURE",
  "requester": {
    "requesterType": "ORGANIZATION",
    "principal": { "principalType": "ORGANIZATION" },
    "mandateId": "mdt_northgate_maintenance_v1"
  },
  "trigger": { "type": "TASK_OUTCOME", "sourceRef": "task_wo_5512_verify:EVIDENCE_INSUFFICIENT" },
  "fulfillment": { "mode": "MARKETPLACE" },
  "relations": {
    "workflowId": "wf_wo_5512",
    "verifiesTaskId": "task_wo_5512_verify"
  },
  "environment": {
    "siteRef": "site:northgate_14_unit_3c",
    "siteConsentRef": "consent_unit_3c_entry_v1"
  },
  "actorRequirement": {
    "permittedActorTypes": ["HUMAN"],
    "minimumTrustTier": "ONBOARDED"
  },
  "completionConditions": [
    { "type": "LOCATION", "id": "in_unit", "zoneRef": "site:northgate_14_unit_3c",
      "relation": "IN", "verificationMethod": "DETERMINISTIC" },
    { "type": "COUNT", "id": "angles", "subjectRef": "capture:guided_angles",
      "min": 3, "verificationMethod": "DETERMINISTIC" },
    { "type": "SEMANTIC", "id": "finished_as_specified",
      "question": "Is the patch flat, primed and painted to match, with no visible seam, as in work order 5512?",
      "verificationMethod": "JEV", "minimumEvidenceOrigin": "TELEPORT_CAPTURE" }
  ],
  "rightsPolicy": { "policyId": "repair-area-only-v1" },
  "economics": {
    "performerPayUsdCents": 900,
    "buyerPriceUsdCents": 1500,
    "settlementAssets": ["FIAT"]
  },
  "popw": { "required": true, "assurancePolicyId": "VERIFIED", "proofTiming": "WORKFLOW" },
  "timing": { "expiresInSeconds": 172800, "priority": "NORMAL" }
}

What this case uses from TAP v0.2

Verify-only tasks
The contractor submits evidence to a task they didn't take from a marketplace (fulfillment.mode = VERIFY_ONLY, submitter = PERFORMER).
Linked tasks
The re-shoot points at the task it verifies (relations.verifiesTaskId), so both land in one workflow proof.
Evidence origin
Each item records where it came from: THIRD_PARTY_SUBMITTED for the upload, TELEPORT_CAPTURE for the re-shoot.
Assurance by origin
Submitted evidence alone tops out at Standard. A Teleport capture of the same claim can reach Verified.
Verification scope (proposed)
A required, hashed statement of what the proof asserts and what it doesn't, first raised by the construction case.

Example economics: $15 to the manager per re-shoot, $9 of it to the re-shooter, paid on accept. The rest covers verification and the proof. When the contractor's photos are enough, there's no re-shoot, just the verification fee. Developer docs

Property managers

Pay for repairs you can see.

Send each work order a Teleport link. We're working with design partners across property and facilities.